Flood Control for the Road at Longwangmiao Reservoir in Changji, Xinjiang

This project was initiated to secure the access road adjacent to the Longwangmiao Reservoir against potential water level rise. A tailored flood barrier system was implemented, providing reliable and robust protection for this critical infrastructure.

Key Implementation Details:

  • Total Protection Length: 42.8 meters

  • Primary Support: Vertical posts measuring 200*80*2.0 mm, each with a length of 2.8 meters.

  • Critical Execution Requirements:

    • All panel ends were fully sealed to ensure a complete and water-tight barrier.

    • A full complement of angle codes was supplied and installed to guarantee structural stability and secure fixation.

The project successfully delivered a resilient defense system, enhancing the safety and operational continuity of the reservoir road.