Lanxi Mabu Subdistrict Lanjiang Tributary Flood Control Cofferdam
To effectively mitigate the impact of water level fluctuations from the upper reaches of the Lanjiang River on coastal areas, the flood control cofferdam project constructed on a tributary of the Lanjiang River in Mabu Subdistrict, Lanxi City, has adopted our high-performance flood panel system. This system, featuring 1-meter high panels with each unit covering 4.5 square meters, is constructed from 5 cm thick aluminum alloy with a 2 wall thickness. Through its modular sealing structure, the product achieves precise water level control, forming an adjustable flood barrier that significantly enhances the region’s disaster prevention and mitigation capabilities.


